back to list

Expressway S3 - task 2
Mota-Engil Central Europe S.A.

The investment project is comprised of:

  • construction of a 16 km long section of the expressway;
  • construction of two interchanges: “Jawor Południe” and “Bolków”;
  • reconstruction of transverse roads crossing the expressway to the extent necessary to implement the investment project – national roads, county roads, municipal roads and internal roads;
  • construction of engineering structures including flyovers and bridges along the expressway and along the transverse roads under reconstruction;
  • construction of access roads and internal roads on the traffic lane of the expressway to provide access to the area adjacent to it and to provide access for equipment connected with the operation of the expressway;
  • construction of a drainage system for the expressway, transverse roads under reconstruction, access roads and internal roads;
  • construction of pavements, exit roads, etc.;
  • construction of facilities for sub-treatment of rainwater and meltwater coming from the traffic lane;
  • construction of traffic arrangement and road safety elements;
  • construction of roadside fencing;
  • reconstruction of facilities for basic and specific drainage, including construction of reinforced concrete culverts along the drainage ditches and watercourses under reconstruction;
  • construction of noise barriers;
  • construction of crossings for animals and passages for amphibians;
  • construction of roadside lighting;
  • reconstruction of existing ground and underground technical infrastructure unrelated to, but colliding with the investment project, including:
  • telecommunications lines;
  • water supply networks;
  • gas networks;
  • sewage networks;
  • power networks;
  • construction of new technical infrastructure connected with the expressway, including:
  • lines and facilities of the road information system;
  • roadside lighting;
  • road drainage – stormwater drainage system;
  • clearance of existing low and high greenery in the traffic lane of expressway S-3;
  • reinstatement of land following demolitions of existing road sections and other facilities of technical infrastructure;
  • planting of low greenery, high protective greenery and guiding greenery.