zamknij

Portfolio

back to list

Reconstruction of railway line No. 139 in the section of Bielsko-Biała – Wilkowice
INTOP Warszawa

The investment project is comprised of:

• reconstruction of two tracks of railway line No. 139 in the section of Bielsko-Biała – Wilkowice, approximately 8.3 km long;
• reconstruction of the railway traffic control network;
• reconstruction of the traction network;
• reconstruction of the power grid;
• reconstruction of railway engineering structures – viaducts, bridges, culverts, platform descents, footbridges;
• reconstruction of railway buildings;
• reconstruction of the track system;
• reconstruction of railway passages and the infrastructure;
• reconstruction of platforms, platform shelters and platform accesses at Bielsko-Biała Lipnik, Leszczyny, Mikuszowice, Wilkowice and Wilkowice Bystra stations;
restoration of the scheduled speed not less than 130 km/h;

Location

12 49.79123931940705,19.08462568164066 roadmap

Otwórz lokalizację w google maps