S10 - Kobylanka Bypass
Strabag Infrastruktura Południe Sp. z o.o.

The investment project is comprised of:

• construction of 6.4 km long north roadway of the Kobylanka bypass;
• construction of an auxiliary road, section Niedźwiedź – Zdunowo;
• construction of a slip road at the Motaniec junction;
• construction of engineering structure WD-4L;
• milling the wearing layer of the existing roadway of the bypass and existing slip roads of the Motaniec and Lipnik junctions (Stargard Zachód);
• construction of a communication engineering drainage system;
• construction and reconstruction of storm water drainage, construction of a drainage system for the road embankment;
• reconstruction of lighting;
• reconstruction of communication engineering and gas network, protecting the existing networks;
• permanent closure of the exit road to Kobylanka and liquidation of the crossroads to the village of Niedźwiedź along national road No. 10;

Location